•It is the work of drilling and pump tests for dewatering the field in Koza Bergama Production Site and installing the appropriate motor pump system in the wells.
• Drilling and pump tests for dewatering the field in Koza Gümüşhane Mastra Production Site and installation of the appropriate motor pump system to the wells
• In Koza Giresun Kazıkbeli Plateau Production Site, drilling work for dewatering the field, pump tests and installation of the appropriate motor pump system to the wells
• Under the control of SRK Consulting, drilling work and pump tests for dewatering the field at Boğazlıyan Production Site and installation of the appropriate motor pump system to the wells