Bu görsel boş bir alt niteliğe sahip; dosya adı rr-8.png

•Erzincan Construction Site
•Reconstruction of the water wells of Anagold Mining, which will be flooded by the Bağıştaş Dam constructed by IC İçtaş in İliç, Erzincan, in different areas, and the assembly and installation of motor pump systems.
• For the liquefaction analysis of the port construction site, a total of drilling works were carried out at 10 locations in the field, and soil liquefaction analysis was carried out. Sonde