
•Within the scope of the TANAP Project, water drilling works and pump tests were carried out on the pipeline route.
Provinces studied: Ardahan – Posof, Ardahan – Damal, Eskişehir – Seyitgazi, Çanakkale – Gallipoli, Edirne – Ipsala
• At Koza Kayseri Himmetdede Production Site, drilling works for dewatering the field and pump tests and installation of the appropriate motor pump system to the wells